Gujarat Energy Transmission Corporation Ltd.
×
Renewable Energy integration application shall be processed as per the Hon�ble GERC approved Procedure for grant of connectivity to projects based on renewable energy sources to intra-state transmission system.
Renewable Energy integration application shall be processed as per the Hon�ble GERC approved Procedure for grant of connectivity to projects based on renewable energy sources to intra-state transmission system.
(1) This list is indicative only and does not stipulate available evacuation capacity at these substations.
(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.
(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.
(4) RE power integration at EHV level shall be finalized after detailed system study.
(5) The feasible capacity that could be granted may not be the algebraic sum of the capacities mentioned in substation / cluster. It may vary based on the capacity granted in the adjoining substations.
(6) The availability of required feeder bays at each GETCO substation is to be checked separately after receipt of an application. In case of line bay issue at a specified substation, developer has to select nearby substation from the list.
(7) RE capacity may reduce while granting Stage -II connectivity, in case RE capacity is granted at 11kV level OR to another Stage-I grantee at a particular substation or cluster of substations.
(8) The substations mentioned with planned infrastructure as per the list are based on anticipated to be feasible within next six (6) months. However, due to any reason, whatsoever, if the substation / infrastructure is not constructed or commissioned, GETCO shall not be responsible to any person or legal entity in this respect.
Any person or legal entity applying for connectivity to these substations likely to be commissioned, shall make an application with clear understanding that the sub stations may or may not get commissioned as per the schedule or may not come up at all without notice or assigning reasons thereof; no claim shall be entertained from any person or legal entity in this regard.